
Free Case Study
Replacing a Workhorse: End-of-Life Propylene Condenser Rebuilt Right
Download this case study to see how Metalforms engineered, fabricated, and delivered a replacement condenser for a Gulf Coast petrochemical facility - featuring more than 11,000 precision welds and a complete in-house manufacturing process.
Dowload now to learn about:
- Replacing an end-of-life propylene condenser with a custom-built solution
- Over 11,000 precision tube-to-tubesheet welds for long-term reliability
- Complete in-house engineering, fabrication, thermal design, inspection, and coatings
- Custom carbon steel construction built for demanding Gulf Coast environments
- A 113,800 lb., 32-foot condenser manufactured in 36 weeks
- Materials selected for corrosion resistance, durability, and long service life
